Project Overview
Over the last decade, extensive efforts have been put into creating beautiful parks, venues and entertainment spaces on Buffalo’s beautiful waterfront. Those efforts have included shoreline stabilization at various locations, erosion control, grading, leveling and construction. At Bell Slip, areas surrounding the water required stabilization and erosion control. At Wilkeson Pointe, a large slide was installed for children to play on. The area surrounding the slide needed to be rebuilt for safety and environmental concerns. NW Contracting sent their general contracting and site work teams to work.